Client portal

  December 5, 2020  by  Mr. S S.
Server is now Live
  November 26, 2020  by  Mr. S S.
We have decided to move away to a new provider, to a much better server. The server will come with more storage and will be SSD instead of HDD and will have 64 GB of RAM (current server is 16 GB) and faster gigabit connectivity (current server is 100Mbs) and much higher bandwidth cap as well, so sites performance should be much better and also allow us to provide more storage and bandwidth per site/account.
  December 4, 2020  by  Mr. S S.
We are switching to new server tonight at 10 : 00 AM ET.
Powered by